About Us

Pressure, temperature, load cycles, and media are not the enemies of sealing technology in our view — they are the challenges we gladly take on.

A few milestones from our history:

1996 – Initial developments in sealing technology for valve construction (spring-loaded sealing systems, high-performance packings)

1997 – First special-purpose solutions for refineries (problem-solving for shell-and-tube heat exchangers)

1999 – Expansion of calculation services and technical documentation (strength and tightness analysis for flanged joints and valves)

2005 – Spring-loaded stem sealing systems for tank valve assemblies according to TA Luft (certification, manufacturing, and on-site installation)

2007 – High-pressure steam boilers equipped with sealing systems in power plant bypass operations

2018 – Founding of Ernst Industrietechnik GmbH as part of the AMC Group

2020 – Development of the S4Q software for flange joint post-inspection during plant shutdowns

2022 – Development of a standardized emergency leak sealing system without injection agents

2025 – Commissioning of a coating facility for hard-coated slide rings and functional surfaces (in cooperation with GLOBAL Technik)